Version: RR 5.2
New Features and Enhancements:Bug fixes
Improved Error Message when a new Recommendation is created with the same name as an an already existing recommendation.
Riocan staging (5.2) OHS dashboard error when accident is enabled and OHS meeting tasks in database - Fixed
Property Projects > Documents > Unable to edit existing documents
Property projects > Mortgage Undertakings > Documents
For documents uploaded through New Document button, there is an option to Delete the file, upload new files, but the changes cannot be saved. This issue is fixed now.ModuleSection | RDS # | Description | |||
---|---|---|---|---|---|
Tasks | RR- | 3331Ability to take, add, update and annotate photos for Environmental Risk Records | Application | RR-3563 | Option to select hourly recurrance intervals for tasks |
ApplicationTasks | RR-2402 | Surveys / Inspections: Hidden Categories and Questions now only display as appropriate | |||
Application | RR-2674 | Attachments preview - ability to preview attached image files. | |||
Application | RR-2689 | Add Lock/Approve for Checklist : Checklist now has the option to be locked/approved, matching the functionality that exists for questionnaires. Once locked/approved, a PDF will be generated automatically and saved under Documents/Reports. Any user can approve checklist and checklist is not required to be 100% complete before approval. | Application | RR-2692 | |
Application | RR-2622 RR-2637 RR-2717 | Questionnaire/Checklist changes:
| |||
Application | RR-2763 RR-2770 | Questionnaire/Checklist changes: Lock is renamed to "Approve" and Unlock is renamed to "Open" Checklists:
Questionnaires:
Make percentage completion bar available on both wizard and classic mode for checklist | |||
Application/ Administration | RR-2787 | Automatic task creation based on questionnaire/checklist answer: Administrators can now setup a task to be created automatically based on a specific questionnaire or checklist answer. This feature is created to support workflows to be triggered based on the answer given so that corrective actions / work orders can be initiated accordingly. To configure task creation, go to Administration >> Questionnaire and select the questionnaire/checklist. Locate the question and select the configuration icon beside the answer you want to configure a task for: When the particular answer is selected by the user, a task is automatically created as per the above configuration. When the specified answer is provided, the task is automatically created. Selecting the option "allow task to edit" displays a pop=up to the user with the option to further modify the task. Otherwise the task will be created and assigned as defined. | |||
Administration | RR-2727 | Default Work Order Type in Questionnaire Administration: A new field added in Questionnaire admin to capture Default Work Order type. All work orders created from this questionnaire/checklist will be defaulted to the selected Work Order type | Administration | RR-2749 | |
Application | RR-2884 | Task Assignment Emails - Opt-in in user profile to allow task notifications This option is not selected by default, meaning the user will not receive task assignment notifications. Once the option is checked(either by the user/administrator), the user will receive notification mails whenever a task is assigned to them. Note: This is a new setting that allows the user to control whether they receive task notifications by email. | |||
OHS, Environmental | RR-2613 RR-2373 RR-2384 | The Assessments / Inspections Dashboard provides a snapshot view of the status of any recurring assessments/inspections as required. Whether looking at a specific set of properties or across the portfolio, the dashboard makes it possible to easily identify reports that have been completed and are missing / past due so they can be addressed. Please see the Assessments / Inspections Dashboard link for full documentation. | |||
OHS | RR-2507 | View incident report log- Audit log is modified to capture View Incident report event, it will display a record in History tab for each View event. | |||
OHS | RR-2777 | OHS Incidents Save - Incident report will be saved automatically when "Next" button is selected throughout the report. This ensures that users will not lose all saved information if the system times out before completing the incident report. | |||
OHS | RR-2786 | OHS - New security setting to view restricted comments(specific to OHS) | |||
OHS | RR-2819 | OHS Incidents - Alert Notifications - "Updated By" field added as a condition. This addresses the use case of withholding alerts for updates made by the Admin team or specific users. | OHS | RR-2836 RR-2837 | |
OHS | RR-2883 | Incident Report - Generate PDF feature: Each incident report has a PDF option, clicking on which will generate a PDF file with all the incident details. | Work Orders | Work Order templates - Work Order Template is a new feature available for selection when creating a new workorder from the Work Order dashboard. When a template is selected, the corresponding fields in task will be filled with those in the selected template. Customized work order templates can be created and used by multiple work orders.Work order template selection available above Title when creating new work order from Work Order dashboard Ability to create task directly from Work Order Template: | |
Work orders | RR-2601 RR-2732 | Changes to the content of the weekly task summary email | |||
Work orders | RR-2611 RR-2733 | Changes to the content of the Task assignment notification email | Work Orders | Work Orders dashboard Work Order dashboard should include all tasks from active modules, including insurance tasks and OHS meeting tasks. The dashboard can be filtered by module. Overdue Work orders can be drilled down. Work Orders can be viewed by Property using the Work Orders By Property link. Work Order Templates can be viewed/created using Work Order Templates link. New workorders also can be created using the above 2 options. | |
Work Orders | RR-2725 | Location field added in General work order. | |||
Work Order | RR-2941 | Ability to enter any work order type: In addition to selecting from list of Work Order types configured for the module, the + icon allows the user to add a new Work Order type and associate the same to the Work Order. | |||
Questionnaire OHS Risk Management Work Orders | RR-2760 RR-2785 RR-2967 RR-3055 | Short description with Attachments: Ability to add a short description with each attachment in the following locations:
| |||
Risk Management | RR-2791 | Insurance Claim form is split into multiple tabs | |||
Risk Management | RR-2792 | Audit log implemented for Insurance Claim and History tab added to the form capturing/displaying the same. | |||
Risk Management | RR-2793 | Building selection in Risk Management module All the features in Risk Management module now support Property as well as Building level. A drop down is available in all pages to select one of these: Property, All Buildings and Individual buildings for the property. Based on the selection, the below pages filter details only for the Property/All buildings/the building selected. 1. Property Summary: Alerts and notifications will be filtered based on the property/building selection. 2. Documents/Reports: Documents displayed will be filtered based on the selection. New documents will be added to the entity selected(Property/building). 3. Tasks: Tasks list will be filtered based on the selection . Also, when a new task is created, the task is added to the entity selected(Property/building). 4. Insurance Claims: The list of claims will be filtered based on the selection. New claims will be added to the entity selected(Property/building). 5. Tenant Insurance:The list will be filtered based on the selection. Risk Management module can be launched from the Building list now and the Property summary page will be opened with the selected building. | Risk Management | RR-2822 RR-2959 RR-3093 RR-3095 RR-3098 RR-3253 | Risk Management | RR-3141 RR-3233 |
Property Projects | RR-3162 | Property projects - Time the project created was being recorded and displayed in UTC. This is now changed to display the actual time that the project was created. Changes have been made to ensure all the places where Date/Time is displayed in Property Projects display the actual time(EST) and not UTC. | |||
Property Projects | RR-3165 | Property Projects - Date and time has been included for all attachments in Property projects. Repairs > Attachment tab Projects > Documents and attachment tab |
Known Issues and Stability Fixes
3530 | Task history now lists the Completed By and Completed Date to indicate who completed the task and the date it was marked as complete. | |
Tasks | RR-3578 | Slide tasks left or right to quickly complete them from the task list. From the Task History, slide completed tasks left or right to reopen. |
Surveys / Checklists | RR-3547 | Resolved issue with categories and questions displaying despite being locked. |
Surveys / Checklists | RR-3540 | New ability to slide left to lock a completed survey. Once locked, the survey will be hidden. Select the new "View All" option from the top right menu to include completed surveys in the list view. |
Surveys / Checklists | RR-3570 | Resolved issue with question options and tasks remaining on survey / checklist questions, even when answer is changed. |
Enbironmental Risks | RR-3331 | Ability to take, add, update and annotate photos for Environmental Risk Records |
Login | RR-3306 | Option now available to reset / recover password by providing the user with a validation code via email. |